Skip to content
Mehul Munjani

Home/Work/Mr. Cooper

Mr. Cooper design system

One design system that replaced scattered UI components across 15+ Mr. Cooper products on web, iOS, Android and hybrid apps.

Design systemsFintechPassword protected
Client
Mr. Cooper
Role
Sr. UX/UI Designer
Timeline
2024 to 2025 (6 months)
Platforms
Web, iOS, Android, hybrid
Read
8 min
Mr. Cooper design system 1.0: typography, colors and components
Challenge

15+ products had drifted into inconsistent, inaccessible UI.

My role

Design system strategy and design, over 6 months, in Figma, Jira and Confluence.

Result

40% faster handoff, 58% fewer high-severity UI bugs, and every component WCAG 2.1 AA compliant.

The short version

The problem

Mr. Cooper's 15+ digital products had no shared design language. Users got confused, and teams kept rebuilding the same things. Uneven accessibility created compliance risk, and the patchy look weakened trust in the brand.

How I worked

  1. Audit 15+ products
  2. Define principles
  3. Build tokens and foundations
  4. Build the component library
  5. Document and roll out

Outcome

In six months it became the single source of truth for designers and developers. Rework dropped and releases sped up.

40%faster design-to-dev handoff (5 days to 3)
58%fewer high-severity UI bugs per release (12 to 5)
0critical accessibility violations (down from 63)

The full case study is password protected

The screens, research and full process are behind a password. Ask me for access and I'll walk you through it.

Contact

Got a product that needs untangling?

contact@mehulmunjani.com